Recent Posts

    Recent Comments

    No comments to show.

    Photos

    Main Building – Front View
    Main Building – Front View
    Main Building – Close Up
    Main Building – Night View
    Communications Complex – Aerial View
    Main Building – Dispatch
    Main Building – Dispatch
    Main Building – Dispatch – Radio Control (JPS ACU WAIS)
    Main Building – Dispatch
    Main Building – Incident Command
    Main Building – Incident Command
    Main Building – Break Out Room
    Incident Command COML With WAIS and FLEX Radio Control
    Incident Command Radio Operator (RADO) Positions (JPS ACU WAIS)
    Main Building- Computer Server Room
    Main Building- Computer Server Room
    Main Building- Computer Server Room – 9-1-1 SOLACOM Servers
    Tower Complex – Night View
    Main Building (L) and Tower Complex – Main Tower (R)
    Main Tower
    Main Tower – Microwave
    Main Tower – UHF Yagi Antennas
    Main Tower – VHF Omni Antennas
    Main Tower – Multiple Antennas (HF Inverted Vees, HF Long Wire, VHF Vertical. UHF Vertical)
    Tower Complex – Vertical HF Dipole (Force12)
    Main Tower – Ice Bridge and Feedlines From Tower to Equipment Building
    Tower Complex – Equipment Building Without Electronics
    Tower Complex – Equipment Building – Feedlines From Ice Bridge and Tower
    Tower Complex – Equipment Building With Electronics
    Tower Complex – Equipment Building – With Electronics
    Tower Complex – Equipment Building – Radio Cabinets (JPS ACU WAIS)
    Tower Complex – Equipment Building – Radio Cabinets – Closeup (JPS ACU WAIS)
    Tower Complex – Equipment Building – VHF and UHF Repeaters (dStar)
    Tower Complex – Equipment Building – UHF Repeaters (Motorola)
    Tower Complex – Equipment Building – HF Equipment (FlexRadio)
    Tower Complex – HF Amplifier (Henry 4k Ultra)
    Tower Complex – Generators
    Tower Complex – Fuel Tank for Generators
    Tower Complex – Satellite Dish
    Tower Complex – Security Cameras
    Tower Complex – Construction
    Tower Complex – Construction
    Tower Complex – Construction
    Main Building – Construction Outside View
    Main Building – Construction Outside View
    Main Building – Construction Outside View
    Main Building – Construction Inside View
    3 Inch Thick, Multi-Layered Ballistic Glass Used In Main Building